{"id":16226,"date":"2026-11-27T18:18:25","date_gmt":"2026-11-27T15:18:25","guid":{"rendered":"https:\/\/dhtmlx.com\/blog\/?p=16226"},"modified":"2026-11-27T19:22:16","modified_gmt":"2026-11-27T16:22:16","slug":"dhtmlx-planning-engine-1-1","status":"publish","type":"post","link":"https:\/\/dhtmlx.com\/blog\/dhtmlx-planning-engine-1-1\/","title":{"rendered":"DHTMLX Planning Engine 1.1: Scheduling for Shifts, Part-Timers, and Projects Already in Progress"},"content":{"rendered":"<p>Most plans look tidy at the start. Everyone works Monday to Friday, 8 hours a day. Every task takes whole days, and nothing has started yet. Then the plan meets a real week. Fridays end at 13:00 in summer, a machine becomes unavailable for a couple of hours on Tuesday, and several tasks are already in progress when something changes.<\/p>\n<p><a href=\"https:\/\/dhtmlx.com\/docs\/products\/planning-engine\/\" target=\"_blank\">DHTMLX Planning Engine<\/a> 1.1 is about that real week. Version 1.0 delivered Gantt-compatible scheduling, with resource leveling and assignment on top. Version 1.1 builds on it with more accurate calculations for shifts, calendars, and replanning that real projects need. The main changes are:<\/p>\n<ul>\n<li><strong>Effort-Driven scheduling and task types.<\/strong> A task can store work in addition to duration. The Fixed Work, Fixed Duration and Fixed Units task types, together with the effort-driven flag, determine what is recalculated when work, duration or assignment units change.<\/li>\n<li><strong>Progress-Aware replanning.<\/strong> Tasks with recorded progress keep their start dates, and a cutoff date prevents the engine from scheduling new work before that date, so it reschedules only the forecast.<\/li>\n<li><strong>Calendar inheritance and recurring exceptions.<\/strong> Calendars can inherit working hours and rules from other calendars (company, office, personal). Weekdays can have several shifts, working hours can change by season, and holidays can repeat by rule.<\/li>\n<li><strong>Availability-based resource load.<\/strong> Load by hour, day, or week is measured against the working time each resource actually has.<\/li>\n<li><strong>Forward resource leveling and improved workload management.<\/strong> A new strategy that places tasks in dependency order, starting each task as early as resource availability allows, and then repairs remaining overload. V1.1 adds work-weighted resource load calculations, more control over task splitting, and previews of leveled schedules.<\/li>\n<li><strong>Configurable working-day length.<\/strong> Day-based durations are calculated from a working day of configurable length (480 minutes by default). Fractional durations are calculated precisely.<\/li>\n<\/ul>\n<h3>New to the engine?<\/h3>\n<p><a href=\"https:\/\/dhtmlx.com\/docs\/products\/planning-engine\/\" target=\"_blank\">DHTMLX Planning Engine<\/a> is a headless scheduling engine: no UI, just the calculations. Feed it tasks, dependencies, calendars, and resources. It returns realistic dates, resource overloads, and the knock-on effects of any change. It runs in the browser and on the server (TypeScript, WASM, Rust, .NET, Java).<\/p>\n\n\t\t<div class='post-banner'>\n\t\t    <div class='post-banner__inside'>\n\t\t        <div>\n\t\t            <div class=\"post-banner__title\">Put DHTMLX Planning Engibe 1.1 to Work<\/div>\n\t\t            <div class=\"post-banner__text\">Find the setup instructions and code examples to integrate the engine into your app<\/div>\n                <\/div>\n\t\t            \n                \n            <div class='post-banner__btn'>\n                <a href='https:\/\/docs.dhtmlx.com\/planning-engine\/#start-integrating' title='' class='button-secondary'>Get started<\/a>\n            <\/div>\n        \n            <\/div>\n\t\t<\/div>\n\t\n<p>The rest of this post covers what\u2019s new in v1.1 and the planning cases it handles.<\/p>\n<h2>Effort-Driven Scheduling and Task Types<\/h2>\n<p>Adding a person to a task has different consequences depending on the task. In v1.1, a task can have work (effort) as well as a duration. The engine supports three task types (Fixed Work, Fixed Duration, and Fixed Units) and effort-driven scheduling. All these concepts are also used in MS Project and <a href=\"https:\/\/dhtmlx.com\/blog\/dhtmlx-gantt-10-1\/\" target=\"_blank\">DHTMLX Gantt v10.1+<\/a>. The engine maintains the relationship Work = Duration \u00d7 total Assignment Units, and the task type decides which of the three values is recalculated when another one changes. To explain properly how these task type settings work in practice, let&#8217;s assume that a task initially has one person assigned at 100% capacity. <\/p>\n<ul>\n<li><strong>Fixed Work<\/strong>. Content migration holds 8 person-days of work. Assign Ben at 100% in addition to Ana, and the total units rise from 100% to 200%, so the duration drops from 8 days to 4. Fixed Work tasks are always effort-driven.<\/li>\n<li><strong>Fixed Duration<\/strong>. A launch campaign runs for 6 days. Assign Cy as well, and the dates stay the same. With effort-driven scheduling the work is shared, so each person carries 50% units and the total work is unchanged.<\/li>\n<li><strong>Fixed Units (default)<\/strong>. The support desk is staffed for 5 days. With effort-driven scheduling switched off, assigning Ben keeps the duration at 5 days, and the total work doubles.<\/li>\n<\/ul>\n<p>For an application, this means users can add or remove assignees and see the recalculated duration, units or work immediately. The application doesn\u2019t need duration formulas of its own that have to be kept in sync after every edit. Projects that don&#8217;t specify work continue to be scheduled by duration, as in version 1.0. Work-based recalculation applies in native mode; with <strong>compat: &#8220;gantt&#8221;<\/strong>, the application supplies the task duration. The <a href=\"https:\/\/docs.dhtmlx.com\/planning-engine\/modeling\/#effort-and-task-types\" target=\"_blank\">effort and task types<\/a> guide explains how work and task types function in Planning Engine, while <a href=\"https:\/\/docs.dhtmlx.com\/planning-engine\/ms-project-parity\/#work-and-task-types\" target=\"_blank\">work and task types compared with MS Project<\/a> highlights the difference between the two.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/task-panel-with-Duration-Units-and-Work.-1.png\" alt=\"task panel with Duration, Units, and Work\" width=\"1161\" height=\"604\" class=\"alignleft size-full wp-image-16243\" srcset=\"https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/task-panel-with-Duration-Units-and-Work.-1.png 1161w, https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/task-panel-with-Duration-Units-and-Work.-1-300x156.png 300w, https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/task-panel-with-Duration-Units-and-Work.-1-1024x533.png 1024w, https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/task-panel-with-Duration-Units-and-Work.-1-768x400.png 768w\" sizes=\"auto, (max-width: 1161px) 100vw, 1161px\" \/><br \/>\n<em>A task panel with duration, units and work: the lock marks the value that the task type keeps fixed when another one changes. <a href=\"https:\/\/dhtmlx.com\/docs\/products\/planning-engine\/demos\/task-types\/\" target=\"_blank\">Open demo ><\/a><\/em> <\/p>\n<h2>Progress-Aware Replanning<\/h2>\n<p>Scheduling a new project is straightforward. Once work is under way, part of the plan is history and part is forecast, and Planning Engine 1.1 keeps the two apart. To protect the history, enable <strong>freeze_started<\/strong> to preserve the start dates of tasks with recorded progress. Also, pass the same <strong>freezeBefore<\/strong> cutoff on each scheduling or leveling call to prevent tasks from being scheduled before that date. If a started task needs more time, its finish can still move.<\/p>\n<p>Take a website relaunch three weeks into the build. Ana is away for a week, the client requests one more page, and a task overruns. The engine reschedules the forecast. It reports dependency violations and missed required project end dates, including how late the affected task is in working time, such as a dependency violated by 2 working days or a launch finishing 1 working day after the required project end. After leveling, it also identifies any remaining resource overload and explains what prevented a correction. Because these results are returned as data, the application decides how to present them to its users. The <a href=\"https:\/\/docs.dhtmlx.com\/planning-engine\/scheduling\/#replanning-a-running-project\" target=\"_blank\">replanning a running project<\/a> guide shows how to set this up.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/A-running-project-with-a-status-date-line-1.png\" alt=\"A running project with a status-date line\" width=\"1517\" height=\"797\" class=\"alignleft size-full wp-image-16234\" srcset=\"https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/A-running-project-with-a-status-date-line-1.png 1517w, https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/A-running-project-with-a-status-date-line-1-300x158.png 300w, https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/A-running-project-with-a-status-date-line-1-1024x538.png 1024w, https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/A-running-project-with-a-status-date-line-1-768x403.png 768w\" sizes=\"auto, (max-width: 1517px) 100vw, 1517px\" \/><br \/>\n<em>A running project with a status-date line: completed work appears to the left, the remaining forecast to the right, and a panel highlights schedule changes and delays. <a href=\"https:\/\/dhtmlx.com\/docs\/products\/planning-engine\/demos\/replan-running\/\" target=\"_blank\">Open demo ><\/a><\/em>  <\/p>\n<h2>Calendar Inheritance and Recurring Exceptions<\/h2>\n<p>Calendars in v1.1 follow the MS Project&#8217;s model and can represent an organization&#8217;s working arrangement. The application defines the company calendar once. Office calendars inherit from it and add local holidays, and personal calendars inherit from the office and add leave or a part-time schedule. <\/p>\n<p>Each weekday can have its own hours and several shifts, working hours can change by season, and exceptions can repeat by rule: a plant closure on the first Friday of every month, or the same holidays every year. Shared rules are defined once on the company calendar, and office and personal calendars inherit them wherever they use the base calendar\u2019s settings. A child calendar can override an inherited weekday: in the demo below, changing the company\u2019s Friday affects London, while Boston keeps its explicitly configured Friday hours. The application therefore doesn\u2019t have to maintain copies of shared rules or expand recurrence rules into individual dates. The <a href=\"https:\/\/docs.dhtmlx.com\/planning-engine\/modeling\/#calendars-and-working-time\" target=\"_blank\">calendars and working time<\/a> guide covers the model, and <a href=\"https:\/\/docs.dhtmlx.com\/planning-engine\/ms-project-parity\/#working-time-calendars\" target=\"_blank\">calendars compared with MS Project<\/a> shows what changed from 1.0.<\/p>\n<p>A calendar change can also be previewed as a what-if scenario, like any other edit. Say an application lets users request a day off for Ana. Before it commits the change, it can show which tasks would move and whether the project still meets its deadline. It can also compare several candidate dates side by side, so users pick the one that costs the plan least.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/Company-office-and-personal-calendars-1.png\" alt=\"Calendar inheritance\" width=\"1536\" height=\"876\" class=\"alignleft size-full wp-image-16235\" srcset=\"https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/Company-office-and-personal-calendars-1.png 1536w, https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/Company-office-and-personal-calendars-1-300x171.png 300w, https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/Company-office-and-personal-calendars-1-1024x584.png 1024w, https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/Company-office-and-personal-calendars-1-768x438.png 768w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><br \/>\n<em>A calendar hierarchy showing company, office (London and Boston), and personal calendars, alongside a project plan where moved tasks indicate which calendar rules affected their dates. <a href=\"https:\/\/dhtmlx.com\/docs\/products\/planning-engine\/demos\/calendar-inheritance\/\" target=\"_blank\">Open demo ><\/a><\/em> <\/p>\n<h2>Availability-Based Resource Load<\/h2>\n<p>Resource load follows the same calendars. In resource-calendar mode, an application can show load per person, rolled up by team, by hour, day or week, as a share of the time each resource actually has available. A part-time person who is fully booked shows 100%, the same as a full-time person. A week of leave has no available time, so it isn\u2019t reported as spare capacity. Use hourly buckets to detect overlaps that daily or weekly averages can hide. See <a href=\"https:\/\/docs.dhtmlx.com\/planning-engine\/resource-planning\/#reading-load-and-capacity\" target=\"_blank\">reading load and capacity<\/a> for how to read the results.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/Share-of-available-time-that-the-plan-books-with-teams-rolled-up-1.png\" alt=\"Share of available time that the plan books\" width=\"1195\" height=\"711\" class=\"alignleft size-full wp-image-16236\" srcset=\"https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/Share-of-available-time-that-the-plan-books-with-teams-rolled-up-1.png 1195w, https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/Share-of-available-time-that-the-plan-books-with-teams-rolled-up-1-300x178.png 300w, https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/Share-of-available-time-that-the-plan-books-with-teams-rolled-up-1-1024x609.png 1024w, https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/Share-of-available-time-that-the-plan-books-with-teams-rolled-up-1-768x457.png 768w\" sizes=\"auto, (max-width: 1195px) 100vw, 1195px\" \/><br \/>\n<em>A quarterly view of resource load by week: one cell per person and week showing the share of available time that the plan books, with teams rolled up. <a href=\"https:\/\/dhtmlx.com\/docs\/products\/planning-engine\/demos\/weekly-capacity\/\" target=\"_blank\">Open demo ><\/a><\/em><\/p>\n<h2>Forward Resource Leveling: New Strategy and Greater Flexibility<\/h2>\n<p>In general, leveling handles resource overallocation by delaying or splitting tasks. DHTMLX Planning Engine now offers two <a href=\"https:\/\/docs.dhtmlx.com\/planning-engine\/resource-planning\/#two-leveling-strategies\" target=\"_blank\">leveling strategies<\/a>.<\/p>\n<p>The default strategy, <strong>frontier<\/strong>, works like leveling in MS Project. It finds the first overallocation, delays or splits a task, and repeats, keeping the current dates wherever it can. Version 1.1 adds a new, opt-in forward strategy that rebuilds the plan differently. <\/p>\n<p>It schedules tasks in dependency order, each at the earliest time its assigned resources have available capacity, and then repairs the overallocations that remain. On contended plans, it often finishes earlier with fewer splits. When two tasks need the same person, the new leveling strategy can favor an earlier project finish or protect higher-priority tasks first. <\/p>\n<p>The forward strategy also offers three effort settings:<\/p>\n<ul>\n<li>Fast runs one pass,<\/li>\n<li>Balanced runs six passes with different task orders and keeps the best result,<\/li>\n<li>Thorough adds randomized passes on top.<\/li>\n<\/ul>\n<p>Leveling normally pauses a running task to preserve its earlier work, and a cutoff protects work before a specified date (see <a href=\"https:\/\/docs.dhtmlx.com\/planning-engine\/resource-planning\/#deciding-which-work-gives-way\" target=\"_blank\">deciding which work gives way<\/a>). With either strategy, the same input always produces the same plan.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/leveling-overallocated-schedule-with-engine-strategies-1.png\" alt=\"leveling overallocated schedule with engine strategies \" width=\"1492\" height=\"836\" class=\"alignleft size-full wp-image-16240\" srcset=\"https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/leveling-overallocated-schedule-with-engine-strategies-1.png 1492w, https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/leveling-overallocated-schedule-with-engine-strategies-1-300x168.png 300w, https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/leveling-overallocated-schedule-with-engine-strategies-1-1024x574.png 1024w, https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/leveling-overallocated-schedule-with-engine-strategies-1-768x430.png 768w\" sizes=\"auto, (max-width: 1492px) 100vw, 1492px\" \/><br \/>\n<em>The same overallocated plan leveled with the default strategy and with the new one at three search-effort settings, with project end, total delay and splits for each run. <a href=\"https:\/\/dhtmlx.com\/docs\/products\/planning-engine\/demos\/forward-leveling\/\" target=\"_blank\">Open demo ><\/a><\/em><\/p>\n<p>Overallocation is calculated from work, not from the number of tasks. A resource assigned at 50% to two tasks isn\u2019t overallocated, and partial assignments add up correctly. Applications can also configure the minimum split length, the minimum pause between pieces and the time step that partial moves snap to, so leveling doesn\u2019t produce fragments shorter than the application allows. <\/p>\n<p>A split that a user makes by hand can be preserved: mark the pause with <strong>by: &#8220;user&#8221;<\/strong> so leveling keeps its length, although its position can still shift if earlier work moves. When some overallocation can\u2019t be resolved, the result reports it. <a href=\"https:\/\/docs.dhtmlx.com\/planning-engine\/resource-planning\/#understanding-unresolved-overload\" target=\"_blank\">Understanding unresolved overload<\/a> explains how to read it, and <a href=\"https:\/\/docs.dhtmlx.com\/planning-engine\/resource-planning\/#controlling-the-tradeoffs\" target=\"_blank\">controlling the tradeoffs<\/a> covers the settings above.<\/p>\n<p>Before a user accepts a staffing or calendar change, your application can preview the resulting leveled schedule. The preview shows the dates and resource load that applying the change and leveling with the same options would produce. See <a href=\"https:\/\/docs.dhtmlx.com\/planning-engine\/resource-planning\/#previewing-and-accepting-a-leveled-plan\" target=\"_blank\">previewing and accepting a leveled plan<\/a>.<\/p>\n<h2>Configurable Working-Day Length<\/h2>\n<p>In 1.0, as in DHTMLX Gantt, a &#8220;day&#8221; meant one working date. A Friday with 4 working hours still counted as a full day, regardless of its shorter hours.<\/p>\n<p>By default, one day is now 480 working minutes, so a four-hour Friday counts as half a day.The day length can be configured, or DHTMLX Gantt compatibility can be enabled to retain working-date semantics. Scheduling, leveling and the resource load reports use the same working-time arithmetic, so a short day or a half-day task is counted identically in each of them.<\/p>\n<p>The <a href=\"https:\/\/docs.dhtmlx.com\/planning-engine\/dhx-gantt-parity\/\" target=\"_blank\">guide to using Planning Engine with DHTMLX Gantt<\/a> describes what matches, and <a href=\"https:\/\/docs.dhtmlx.com\/planning-engine\/modeling\/#calendars-and-working-time\" target=\"_blank\">calendars and working time<\/a> explains how working time is counted.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/A-week-on-a-production-line-planned-by-the-hour-1.png\" alt=\"A week on a production line planned by the hour \" width=\"1258\" height=\"805\" class=\"alignleft size-full wp-image-16241\" srcset=\"https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/A-week-on-a-production-line-planned-by-the-hour-1.png 1258w, https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/A-week-on-a-production-line-planned-by-the-hour-1-300x192.png 300w, https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/A-week-on-a-production-line-planned-by-the-hour-1-1024x655.png 1024w, https:\/\/dhtmlx.com\/blog\/wp-content\/uploads\/2026\/11\/A-week-on-a-production-line-planned-by-the-hour-1-768x491.png 768w\" sizes=\"auto, (max-width: 1258px) 100vw, 1258px\" \/><br \/>\n<em>A week on a production line planned by the hour: press, mill and paint jobs on early and late shifts, with load rows per machine and crew. <a href=\"https:\/\/dhtmlx.com\/docs\/products\/planning-engine\/demos\/hourly-shifts\/\" target=\"_blank\">Open demo ><\/a><\/em> <\/p>\n<h2>Try the Demos, Request a Trial, or Submit Your Planning Challenge<\/h2>\n<p>Planning Engine 1.1 builds plans that hold up in real conditions: shifts, part-time staff, shared teams, and projects already in progress. It levels resources, resolves conflicts, and suggests solutions when the plan doesn&#8217;t fit. Your application keeps its own UI and data.<\/p>\n<ul>\n<li><a href=\"https:\/\/dhtmlx.com\/docs\/products\/planning-engine\/demos\/\" target=\"_blank\">Explore the demos<\/a>. Every case in this post runs in your browser.<\/li>\n<li><a href=\"https:\/\/dhtmlx.com\/docs\/products\/planning-engine\/request-trial\/\" target=\"_blank\">Request a trial<\/a> and run the engine on your own data.<\/li>\n<li><a href=\"https:\/\/dhtmlx.com\/docs\/contact.shtml\" target=\"_blank\">Submit your planning challenge<\/a>. Send us your calendars, shift patterns, resource constraints, and the way your users edit plans. Our team will show how Planning Engine solves your scenario, from scheduling and leveling to load balancing.<\/li>\n<li><a href=\"https:\/\/dhtmlx.com\/docs\/products\/planning-engine\/\" target=\"_blank\">Ask about pricing and licensing<\/a>.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Most plans look tidy at the start. Everyone works Monday to Friday, 8 hours a day. Every task takes whole days, and nothing has started yet. Then the plan &#8230;<\/p>\n","protected":false},"author":101014,"featured_media":16247,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[70,1],"tags":[33,87],"class_list":["post-16226","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-releases","category-uncategorized","tag-all-posts","tag-planning-engine"],"_links":{"self":[{"href":"https:\/\/dhtmlx.com\/blog\/wp-json\/wp\/v2\/posts\/16226","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dhtmlx.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dhtmlx.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dhtmlx.com\/blog\/wp-json\/wp\/v2\/users\/101014"}],"replies":[{"embeddable":true,"href":"https:\/\/dhtmlx.com\/blog\/wp-json\/wp\/v2\/comments?post=16226"}],"version-history":[{"count":19,"href":"https:\/\/dhtmlx.com\/blog\/wp-json\/wp\/v2\/posts\/16226\/revisions"}],"predecessor-version":[{"id":16229,"href":"https:\/\/dhtmlx.com\/blog\/wp-json\/wp\/v2\/posts\/16226\/revisions\/16229"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dhtmlx.com\/blog\/wp-json\/wp\/v2\/media\/16247"}],"wp:attachment":[{"href":"https:\/\/dhtmlx.com\/blog\/wp-json\/wp\/v2\/media?parent=16226"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dhtmlx.com\/blog\/wp-json\/wp\/v2\/categories?post=16226"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dhtmlx.com\/blog\/wp-json\/wp\/v2\/tags?post=16226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}